The floor is finally in. Kevin is installing the half-bath toilet and putting the washer/dryer back in as I type this. Things are moving right along. The finish work on the cabinets should be done on Monday, counter tops on Tuesday and the sink and appliances are all done by Wednesday. I've actually gotten kind of used to having the refrigerator right behind my La-Z-Boy, though. A lot further to walk for a cold beer. Oh, well. At least the kitchen will be pretty. UPDATE: Kevin just told me the counter tops should be in Monday instead of Tuesday. Sweet!
Saturday, February 05, 2005
Subscribe to:
Post Comments (Atom)
1 comment:
Did you ever find out what the cabinet "skins" were -- or did he mean "shims?" Does Kevin have a face? Let's take a look at this dude. LM